60 Ave Mixed Use Project
- Location: Surrey, BC, Canada
- Completion Date: Coming Soon
- Architect: DF Architecture
- Structural Engineer: Tides Consulting Ltd.
About this Project
LifeTec has been contracted to design, fabricate, and build the steel structure for this three-story mixed use development.
Our services included:
- Fabrication of Cold Formed Steel (CFS) structure
- Fabricate steel structures in our facility
- Build CFS structure to approved specifications